RWG Groundworks completed the construction of a new equestrian arena to replace an existing riding school that had significant drainage problems and was more than one metre out of level. The project involved extensive excavation, levelling, drainage installation and arena construction to create a durable, high-quality riding surface tailored to the customer's requirements.